• Login
Monday, November 16, 2026
Geneva Times
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil
No Result
View All Result
Geneva Times
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
Home Business

Adani Green says Tarali project involves no forest land or protected areas

GenevaTimes by GenevaTimes
November 16, 2026
in Business
Reading Time: 2 mins read
0
Adani Green says Tarali project involves no forest land or protected areas
Share on FacebookShare on Twitter


Adani Green Energy’s proposed 1,500 MW Tarali Pumped Storage Project in Maharashtra involves an upper reservoir and the existing Tarali reservoir.

Adani Green Energy’s proposed 1,500 MW Tarali Pumped Storage Project in Maharashtra involves an upper reservoir and the existing Tarali reservoir.

Adani Green Energy Limited (AGEL) on Monday said construction activities at its 1,500 MW Tarali Pumped Storage Project in Maharashtra commenced only after obtaining the requisite statutory approvals, clarifying that no component of the project falls within any notified Protected Area and that no forest land is involved.

In a media statement, the company said it had received the No Objection Certificate (NOC) confirming the absence of forest land on January 23, 2024, and obtained environmental clearance on February 11, 2025. The Consent to Establish (CTE), required to commence construction, was subsequently issued on April 7, 2025.

“Construction activities have commenced only after obtaining the requisite approvals from the concerned authorities,” an AGEL spokesperson said.

Clarification follows Maharashtra Forest Department’s halt order

The clarification comes after the Maharashtra Forest Department reportedly ordered a halt to construction activities on November 13, citing the absence of approval from the National Board for Wildlife (NBWL). The project is located in Patan taluka of Satara district.

AGEL said the wildlife clearance process had been initiated and pursued as part of the environmental clearance compliance requirements. The company submitted its proposal for survey and investigation activities in January 2025, which was subsequently recommended by the State Board for Wildlife.

Following this, the company submitted the proposal for clearance to the NBWL for the total project cost, which remains under consideration by wildlife authorities.

Tarali project to have 1,500 MW capacity

The Tarali project, with a proposed capacity of 1,500 MW, involves developing an upper reservoir while utilising the existing Tarali reservoir as the lower reservoir. Pumped storage projects use electricity to pump water to an upper reservoir and release it through turbines to generate power when required.

“The project is being developed in full compliance with applicable statutory requirements and the directions of the competent authorities,” the company said.

Published on November 16, 2026

Read More

Previous Post

Parnell Square: Man sentenced for attempted murder of three children

Next Post

Spanish PM seeks election boost as Brazil’s Lula visits

Next Post
Spanish PM seeks election boost as Brazil’s Lula visits

Spanish PM seeks election boost as Brazil's Lula visits

ADVERTISEMENT
Facebook Twitter Instagram Youtube LinkedIn

Explore the Geneva Times

  • About us
  • Contact us

Contact us:

editor@thegenevatimes.ch

Visit us

© 2023 -2026 Geneva Times| Desgined & Developed by Immanuel Kolwin

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil

© 2023 -2026 Geneva Times| Desgined & Developed by Immanuel Kolwin