• Login
Monday, April 6, 2026
Geneva Times
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil
No Result
View All Result
Geneva Times
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
Home Europe

Spain train disaster probe suggests track was cracked

GenevaTimes by GenevaTimes
January 23, 2026
in Europe
Reading Time: 2 mins read
0
Spain train disaster probe suggests track was cracked
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter



An investigation into last weekend’s high-speed train collision in Spain that killed 45 people suggests the track was cracked before the catastrophe, according to a preliminary report published on Friday.

The shellshocked country is searching for answers to one of Europe’s deadliest such accidents this century, which has raised doubts about the safety of the world’s second-largest high-speed rail network.

The disaster struck in the southern region of Andalusia on Sunday evening when a train run by private firm Iryo derailed and crossed onto the adjacent track, smashing into an oncoming service operated by state company Renfe.

Advertisement

An inspection of the Iryo train “detected notches in the tread of the right-sided wheels” of four carriages, said the preliminary report by the CIAF rail accident investigation committee.

“These notches in the wheels and the deformation observed in the track are compatible with the fact that the track was cracked,” it wrote in what it called a “working hypothesis”.

Notches “with a compatible geometric pattern” were also found on the right-sided wheels of three other trains that had travelled on the same track in the hours before the accident, the CIAF added.

Based on the available information, “we can put forward the hypothesis that the cracking of the track took place before the passage of the Iryo train that suffered the accident, and therefore before the derailment”, it wrote.

The CIAF cautioned that “this hypothesis… must be corroborated by later detailed calculations and analysis”.

Transport Minister Óscar Puente has said the flat, straight stretch of track in question had been recently renovated, while the Iryo train was “practically new”.

Human error has also been ruled out as the trains were travelling within the speed limit.

Investigators continue to examine the scene for evidence.

Read More

Previous Post

Skin Republic: Where great skin became simple

Next Post

Farming accidents in Switzerland caused 22 deaths in 2025

Next Post
Farming accidents in Switzerland caused 22 deaths in 2025

Farming accidents in Switzerland caused 22 deaths in 2025

ADVERTISEMENT
Facebook Twitter Instagram Youtube LinkedIn

Explore the Geneva Times

  • About us
  • Contact us

Contact us:

editor@thegenevatimes.ch

Visit us

© 2023 -2024 Geneva Times| Desgined & Developed by Immanuel Kolwin

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil

© 2023 -2024 Geneva Times| Desgined & Developed by Immanuel Kolwin