• Login
Friday, October 30, 2026
Geneva Times
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil
No Result
View All Result
Geneva Times
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
Home Switzerland

Swiss railways plans CHF7 billion digital upgrade

GenevaTimes by GenevaTimes
October 29, 2026
in Switzerland
Reading Time: 8 mins read
0
Swiss railways plans CHF7 billion digital upgrade
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter


SBB plans to digitise its rail infrastructure at a cost of 7 billion Swiss francs

SBB plans to digitise its rail infrastructure at a cost of 7 billion Swiss francs


Keystone-SDA

The digitalisation of the rail infrastructure by 2045 is expected to cost CHF7 billion. This has been confirmed by Swiss Federal Railways (SBB) and the Federal Office of Transport in response to an enquiry from the Keystone-SDA news agency.





Generated with artificial intelligence.


This content was published on


October 29, 2026 – 11:54

SBB’s funding requirements for the digitalisation of rail transport amount to around CHF7 billion ($8.45 billion), as the Federal Office of Transport (FOT) announced on Thursday in response to an enquiry from the Keystone-SDA news agency. The FOT and SBB have thus confirmed a report in the Swiss paper Neue Zürcher Zeitung.

The 2027 Budget Message had earmarked CHF1 billion for the digitalisation of the rail infrastructure. This would enable a “first important step”, SBB wrote, but would be far from sufficient. In their assessment, these funds would not be enough to implement all the measures commissioned by the FOT.

+ Swiss Federal Railways profits jump as passenger numbers rise

SBB is calling for the digitalisation of the network to be driven forward resolutely, but gives priority to maintaining the existing network and service provision up to 2035. Significant parts of the safety-critical infrastructure would need to be renewed. SBB estimates this would cost around CHF7 billion by 2045.

In response to an enquiry from Keystone-SDA, the FOT confirmed SBB’s funding requirements for the implementation of the digitalisation of rail transport (ERTMS). It added that the funding would be provided through various channels.

+ How we produce news in English
Translated from German, reviewed by an 
English Department journalist. 

Read More

Previous Post

Spain train crash: What happened in the 17 minutes before the collision?

Next Post

Roll The Tape: Goff Is Built To Beat Minnesota; Why McCarthy Is Thriving In New York

Next Post
Roll The Tape: Goff Is Built To Beat Minnesota; Why McCarthy Is Thriving In New York

Roll The Tape: Goff Is Built To Beat Minnesota; Why McCarthy Is Thriving In New York

ADVERTISEMENT
Facebook Twitter Instagram Youtube LinkedIn

Explore the Geneva Times

  • About us
  • Contact us

Contact us:

editor@thegenevatimes.ch

Visit us

© 2023 -2026 Geneva Times| Desgined & Developed by Immanuel Kolwin

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil

© 2023 -2026 Geneva Times| Desgined & Developed by Immanuel Kolwin