• Login
Thursday, October 22, 2026
Geneva Times
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil
No Result
View All Result
Geneva Times
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
Home Switzerland

Swiss nuclear power station back online after a rapid reactor shutdown

GenevaTimes by GenevaTimes
October 21, 2026
in Switzerland
Reading Time: 3 mins read
0
Swiss nuclear power station back online after a rapid reactor shutdown
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter


Gösgen nuclear power station back online following a rapid reactor shutdown

Gösgen nuclear power station back online following a rapid reactor shutdown


Keystone-SDA

The Gösgen nuclear power station in the Swiss canton of Solothurn was reconnected to the grid on Tuesday evening following an automatic emergency reactor shutdown. The Swiss Federal Nuclear Safety Inspectorate (Ensi) had granted authorisation for the plant to be restarted.


This content was published on


October 21, 2026 – 11:01

At 5.50 pm on Tuesday, the nuclear power station was resynchronised with the grid, operator Kernkraftwerk Gösgen-Däniken AG (KKG) announced on Tuesday. Output is now being gradually increased to 100%.

More

Over 125,000 signatures collected against a return to nuclear power

More


Energy transition

Swiss to vote on referendum against new nuclear power plants




This content was published on


Sep 20, 2026



More than 125,000 people signed the referendum petition against the government proposal that was approved by parliament in June.



Read more: Swiss to vote on referendum against new nuclear power plants


At 06.40 on Tuesday morning, an automatic reactor scram occurred during a functional test. According to the operator, this was caused by undervoltage on the control busbars. All safety-related systems responded as intended. No additional release of radioactivity occurred.

+ How we produce news in English
Translated from German, reviewed by an English Department journalist. 

Articles in this story

Read More

Previous Post

More Russians are settling in the EU with each year of war in Ukraine

Next Post

Bukangi: Huge crowds watch shark stranded in Busan, South Korea

Next Post
Bukangi: Huge crowds watch shark stranded in Busan, South Korea

Bukangi: Huge crowds watch shark stranded in Busan, South Korea

ADVERTISEMENT
Facebook Twitter Instagram Youtube LinkedIn

Explore the Geneva Times

  • About us
  • Contact us

Contact us:

editor@thegenevatimes.ch

Visit us

© 2023 -2026 Geneva Times| Desgined & Developed by Immanuel Kolwin

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil

© 2023 -2026 Geneva Times| Desgined & Developed by Immanuel Kolwin