• Login
Monday, July 27, 2026
Geneva Times
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil
No Result
View All Result
Geneva Times
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
Home Switzerland

Cooler river allows Swiss nuclear plant to restart at reduced capacity

GenevaTimes by GenevaTimes
July 27, 2026
in Switzerland
Reading Time: 3 mins read
0
Cooler river allows Swiss nuclear plant to restart at reduced capacity
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter


The Aare is colder and the Beznau reactors are operational, but at reduced power

The Aare is colder and the Beznau reactors are operational, but at reduced power


Keystone-SDA

The two nuclear reactors at Beznau nuclear plant, which are cooled by water from the River Aare, have been reconnected to the electricity grid, albeit at reduced output. They had been shut down on June 26, after the river’s temperature had reached 25°C.


This content was published on


July 27, 2026 – 14:24

The operator Axpo announced today that it had restarted reactor number one on Friday, following approval from the authorities, whilst reactor number two had already been in operation for a week. However, water temperatures are being constantly monitored and the company is ready to take the necessary measures should the limit values be exceeded again.

More

control centre of a nuclear power station

More


Emissions reduction

Nuclear power in Switzerland: ‘The most sensible policy is to keep the existing plants running’




This content was published on


Jul 6, 2026



The Swiss government and parliament want the ban on new plants in Switzerland to be lifted. The final say will rest with the people but what is the current status of the industry?



Read more: Nuclear power in Switzerland: ‘The most sensible policy is to keep the existing plants running’


Reducing output and shutting down the plant are necessary measures to protect the river’s ecosystem and ensure compliance with environmental regulations. Back in July 2025, the power station had already temporarily suspended electricity generation due to water temperature conditions.

+ How we produce English news
Translated from Italian, reviewed by an English Department journalist. 

Articles in this story

Read More

Previous Post

Kyrgyzstan cuts purchases of Russian petroleum coke and bitumen

Next Post

Vinícius Júnior To Arsenal? Why The Real Madrid Star’s Transfer Seems Unlikely

Next Post
Vinícius Júnior To Arsenal? Why The Real Madrid Star’s Transfer Seems Unlikely

Vinícius Júnior To Arsenal? Why The Real Madrid Star's Transfer Seems Unlikely

ADVERTISEMENT
Facebook Twitter Instagram Youtube LinkedIn

Explore the Geneva Times

  • About us
  • Contact us

Contact us:

editor@thegenevatimes.ch

Visit us

© 2023 -2024 Geneva Times| Desgined & Developed by Immanuel Kolwin

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil

© 2023 -2024 Geneva Times| Desgined & Developed by Immanuel Kolwin