• Login
Sunday, May 24, 2026
Geneva Times
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil
No Result
View All Result
Geneva Times
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
Home Switzerland

Gotthard rail tunnel overhaul costs pile up

GenevaTimes by GenevaTimes
May 24, 2026
in Switzerland
Reading Time: 8 mins read
0
Gotthard rail tunnel overhaul costs pile up
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter


Gotthard Base Tunnel

Gotthard Base Tunnel costs set to rise


Keystone / Alexandra Wey

The cost of rail infrastructure renovations at the Gotthard Base Tunnel could overrun by several million francs. The is being caused by delays in replacing the tunnel’s radio communication system, reports the SonntagsBlick newspaper.





Generated with artificial intelligence.


This content was published on


May 24, 2026 – 11:30

+Get the most important news from Switzerland in your inbox

The tunnel’s radio communication system allows train drivers to communicate with each other and contact the operations centre by telephone. It also allows passengers to continue browsing the internet and making phone calls, even deep within the Gotthard Massif.

With the system’s lifespan nearing its end, it should have been replaced during scheduled maintenance work between 2024 and 2026. However, this work has been significantly delayed, according to SonntagsBlick, which refers to the government tender platform.

These delays are reportedly linked to several factors, including technical and organisational problems with the external supplier, as well as complicated access to the tunnel. Abandoning the project is even being considered as an alternative.

Swiss Federal Railways must extend by two years the contracts with the operator of the current installation, with the option of prolonging this extension up to six years.

The maximum planned cost exceeds CHF4.6 million. However, the railway operator notes that part of this amount corresponds to operating expenses that would have had to be incurred in any case.

Translated from French by AI/mga

We select the most relevant news for an international audience and use automatic translation tools to translate them into English. A journalist then reviews the translation for clarity and accuracy before publication.  

Providing you with automatically translated news gives us the time to write more in-depth articles. The news stories we select have been written and carefully fact-checked by an external editorial team from news agencies such as Bloomberg or Keystone.

If you have any questions about how we work, write to us at english@swissinfo.ch

Read More

Previous Post

Russia Batters Kyiv Region With Powerful New Missile In Major Attack; At Least 2 Killed, Dozens Wounded

Next Post

Indy 500 Winners: Complete List Of Champions By Year

Next Post
Indy 500 Winners: Complete List Of Champions By Year

Indy 500 Winners: Complete List Of Champions By Year

ADVERTISEMENT
Facebook Twitter Instagram Youtube LinkedIn

Explore the Geneva Times

  • About us
  • Contact us

Contact us:

editor@thegenevatimes.ch

Visit us

© 2023 -2024 Geneva Times| Desgined & Developed by Immanuel Kolwin

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Editorial
  • Switzerland
  • Europe
  • International
  • UN
  • Business
  • Sports
  • More
    • Article
    • Tamil

© 2023 -2024 Geneva Times| Desgined & Developed by Immanuel Kolwin